Supervision of concrete pumping operations - refresher

Overview

The purpose of Supervision of concrete pumping operations - refresher standard is for delegates who have previously passed training to the full Supervision of concrete pumping operations standard or subsequent refresher training and can provide proof of attendance.

Duration

3 guided learning hours

Purpose/scope

The purpose of Supervision of concrete pumping operations - refresher standard is for delegates who have previously passed training to the full Supervision of concrete pumping operations standard or subsequent refresher training and can provide proof of attendance.

Occupational relevance

Training delivered against this standard would be relevant to the following occupational group(s):

  • supervision

Delegate pre-requisites

Delegates must have successfully completed training to the Supervision of concrete pumping operations standard or subsequent refresher 5 years prior to attending this refresher.

Instruction/supervision

As a minimum, course trainers must be able to demonstrate that, in relation to this standard, they have:

  • an award in education and training (or equivalent, as per requirements for approved training organisations)
  • at least 2 years industrial experience relevant to the scope of the standard
  • a verifiable CV

Delivery

All materials and equipment must be of a suitable quality and quantity for delegates to achieve learning outcomes and must comply with relevant legislation.

The learning environment, class size and delegate/trainer ratio must allow training to be delivered in a safe manner and enable delegates to achieve the learning outcomes.

The following delivery methods may be used in the delivery of this standard:

  • face to face learning environment only (such as classroom/workshop etc.)

This standard is predominantly practical training.

This standard is considered to be set at an intermediate level

Assessment

For the successful completion of training, delegates must complete an end of course practical assessment or knowledge test that measures all learning outcomes and has a pass or fail criteria.

Quality assurance

Assured

Quality assurance against this standard will require initial approval of the training organisation and their content mapped to the standard.

CITB will also conduct an approval intervention, either desk-based or centre visit, to ensure the training organisation can meet the requirements of the training standard.

Approved training organisations (ATOs) will be required to present information on records of training and assessment upon request to CITB for desk-based analysis. They will also be visited annually by the CITB quality assurance team.

Renewal

Renewal every 5 years

Buffer / grace period

6 months

Classification

Recommended renewal

Approval date

November 2018

Review cycle 

On request or 3 years from approval date.

Learning outcomes to be refreshed

Including additional guidance to support training delivery and final assessment

The delegate will be able to:

identify the relevant health, safety and environment legislation appropriate to concrete pumping operations

Delivery guidance:

  • HASAWA 1974
  • The Provision and Use of Work Equipment Regulations 1998 (PUWER)
  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)
  • BS 847:2007 “Code of practice for the safe use of concrete pumps”
  • Safe use of concrete pumps a CPA good practice
  • Manual Handling Operations Regulations
  • Environmental legislation e.g., relating to management of waste concrete and washout water:
    • Salmon and Freshwater Act 1975
    • Water Resources Act 1991 (E&W)
    • Water Industry Act 1991 (E&W)
    • Ground Water Regulations 2009

describe equipment types available and situations where their use is appropriate

Delivery guidance:

  • Trailer mounted pumps
  • Truck mounted pumps
  • Electric pumps
  • Static/mobile Concrete Placing boom

plan pumping operations

Delivery guidance:

  • Concrete operations plan to include:
  • concrete design, soil mechanics
  • logistics
  • site paperwork
  • pumping team
    • roles and responsibilities, competency, PPE
  • hazard identification
  • pre check requirements
  • public interface

supervise site set up requirements in preparation for pumping

Delivery guidance:

  • Installation and checking of ancillaries
  • Pump siting
  • Management checks – what to do and why
  • supervise and control pumping operations

Delivery guidance:

  • Direct control of pumping operations
  • Receiving deliveries, Quality control requirements

describe the activities to be undertaken on completion of pumping

identify and control risks and hazards and implement incident response

Additional information about this standard

Health & Safety Executive (HSE) guides

Legislation

http://www.legislation.gov.uk/

  • Health and Safety at Work etc Act (HSWA) 1974
  • The Work at Height Regulations (WHR) 2005
  • Work at Height (Amended) 2007
  • Personal Protection Equipment (PPE) Regulations 2002
  • Personal Protection Equipment (PPE) at Work Regulations 1992
  • Provision and Use of Work Equipment Regulations (PUWER) (1998 UK 1999 NI)
  • Control of Substances Hazardous to Health Regulations (COSHH )2002
  • Lifting Operations and Lifting Equipment Regulations (LOLER) 1998
  • Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR ) 1995
  • Construction (Design and Management) Regulations (CDM) 2015
  • Construction (Health, Safety and Welfare) Regulations 1996
  • Manual Handling Operations Regulations 1992 as amended 2002
  • Control of Noise at Work Regulations 2005
  • Control of Vibration at Work Regulations 2005