Shaftwall Systems
Overview
Duration
2 days of 6 learning hours
Purpose/scope
The purpose of this standard is to provide the delegate with the knowledge to support the following:
Scope:
- hazards, risk assessment and safe systems of work
- installation of metal stud partitions to maintain designed acoustic and fire performance including deflection heads, T junctions, internal and external corners, door openings, firestop plasterboard joints and service openings
- measuring, cutting and fixing plasterboard
- working to construction and manufacturers drawings
- construction principles
- related products (e.g. plasterboards, fixings, sealants, components, etc.)
- required tools and equipment.
Occupational relevance
Training delivered against this standard would be relevant to the following occupational group(s):
- operative and craft
- supervision
Delegates pre-requisites
There are no delegate pre-requisites as part of this standard, however a basic knowledge of metal stud partitions would be beneficial.
Instruction/supervision
As a minimum, course trainers must be able to demonstrate that, in relation to this standard, they have:
- an award in education and training (or equivalent, as per requirements for approved training organisations)
- successfully completed training to this standard
- at least 2 years relevant industrial experience
- a verifiable CV
Delivery
Delivery may be in an on or off the job environment.
All materials and equipment must be of a suitable quality and quantity for delegates to achieve learning outcomes and must comply with relevant legislation.
The class size and delegate/trainer ratio must allow training to be delivered in a safe manner and enable delegates to achieve the learning outcomes.
The following delivery methods may be used in the delivery of this standard:
- a blend of classroom and e-learning
- a blend of classroom and remote
This standard is considered to contain 51% or more practical training.
This standard is considered to be set at an advanced level.
Assessment
Methods of assessment considered appropriate for training delivered against this standard are:
For the successful completion of training, delegates must complete an end of course practical assessment or knowledge test that measures all learning outcomes and has a pass or fail criteria.
Where this training is assessed using multiple-choice questions, a minimum of 10 questions must be asked and delegates are required to achieve an overall pass mark of at least 80%.
Quality assurance
Assured
Quality assurance against this standard will require initial approval of the training organisation and their content mapped to the standard.
CITB will also conduct an approval intervention, either desk-based or centre visit, to ensure the training organisation can meet the requirements of the training standard.
Approved training organisations (ATOs) will be required to present information on records of training and assessment upon request to CITB for desk-based analysis. They will also be visited annually by the CITB quality assurance team.
Renewal
There are no mandatory renewal or recommended refresher requirements for this standard.
Classification
Lifetime (Please note standards using this classification will only be grant aided once per delegate)
Approval date
December 2021
Review cycle
On request or 3 years from approval date.
Learning outcomes
The delegate will be able to: |
Additional guidance to support learning outcome |
---|---|
comply with information and/or instructions derived from risk assessments and method statements. |
Health and Safety at Work Act 1974 |
use health and safety control equipment safely and comply with the methods of work to carry out the activity in accordance with current legislation and organisational requirements when installing metal stud partitions |
Health and Safety at Work Act 1974 |
demonstrate compliance with given information and relevant legislation when installing metal stud partitions in relation to the following: – safe use of access equipment – safe use, storage and handling of materials, tools and equipment |
|
select resources associated with installing Shaftwall systems including tools, equipment, metal components, fixings, sealants and plasterboard. |
|
demonstrate and maintain a clean work space. |
|
install deflection heads to Shaftwall systems to allow for as specified structural movement. |
Manufacturer's website/technical information |
install T junctions in Shaftwall systems to manufacturers recommendations. |
Manufacturer's website/technical information |
install internal and external corners in Shaftwall systems to manufacturers recommendations. |
Manufacturer's website/technical information |
install door openings in Shaftwall systems to manufacturers recommendations. |
Manufacturer's website/technical information |
install and firestop plasterboard joints in Shaftwall systems to manufacturers recommendations to maintain fire performance. |
Manufacturer's website/technical information |
install service openings in Shaftwall partitions from manufacturers details to maintain fire performance of the specified partition to manufacturers recommendations. |
Manufacturer's website/technical information |
extend studs when constructing Shaftwall systems over stud length. |
Manufacturer's website/technical information |
measure, cut and install plasterboard to Shaftwall systems, in both single layers and multiple layers. |
|