Facebook Pixel
Skip to content

Search results

Found 90 short duration training standards. The standards are sorted in alphabetical order

Use the Download as CSV button to save these search results to your computer. We update these standards frequently, so you should check the website and download a new version regularly.

Modern site culture


NEC compensation events

The purpose of this standard is to provide learners with an opportunity to increase their understanding of compensation events, the compensation event procedures and rules for assessment of compensation events, under NEC Engineering and Construction Contracts.

NEC contract introduction

The purpose of this standard is to provide learners with an overview of the NEC Engineering and Construction Contracts.

NEC defined cost

The purpose of this standard is to provide learners with an opportunity to increase their understanding of defined cost, what is allowable as defined cost under the main options and what constitutes disallowed cost, under NEC Engineering and Construction Contracts.

NEC delays

The purpose of this standard is to provide learners with an opportunity to increase their understanding of delays and provide general guidance on delay assessment and liability for delay, under NEC Engineering and Construction Contracts.

NEC formation and administration of sub-contracts

The purpose of this standard is to provide learners with an opportunity to increase their understanding of forming and administering subcontracts under a NEC Engineering and Construction Contracts.

NEC option C and D

The purpose of this standard is to provide learners with a brief understanding of Option C and D under the NEC Engineering and Construction target contracts.

NEC preparation and relevance of the contract data

The purpose of this standard is to provide learners with a detailed understanding of the content preparation and relevance of the contract data under the NEC Engineering and Construction contracts.

NEC Programmes

The purpose of this standard is to provide learners with a reasonably detailed understanding of programmes under the NEC Engineering and Construction contracts.

NEC timescales and failure to comply

The purpose of this standard is to provide learners with an opportunity to increase their understanding of administration of timescales and failure to comply rules within a NEC Engineering and Construction Subcontract.

How did we do today? Give feedback